OT / ICS Risk Assessment Platform

Your NIS2 & IEC 62443
risk assessment.
In hours, not weeks.

Build compliance, visibility and security in days — not months.

ARA automates the OT cybersecurity risk assessment process — from IEC 62443 gap analysis to executive-ready PDF reports. What consulting firms bill 4–8 weeks for, ARA delivers in a single session.

✉ Request Free Demo See how it works →
142
IEC 62443 SL-2 controls mapped automatically
<4h
From first login to full risk assessment report
6
Professional deliverables generated automatically
Less expensive than a traditional OT audit
Professional Deliverables

6 documents that used to cost
€50,000–150,000. Generated automatically.

Every ARA assessment produces a complete set of professional documents — the same deliverables large enterprises pay consulting firms months to produce.

RISK MATRIX CRIT HIGH SL-2 COVERAGE 59% IEC 62443 SL-2 FINDINGS ● CRITICAL: 7 ● HIGH: 12 ● MEDIUM: 18 ● LOW: 5 CONNECTED ARA RISK ASSESSMENT DASHBOARD Usine Nord SAS · IEC 62443 SL-2 · June 2026 59%
OT Risk Assessment Report
Complete OT Risk Assessment Report

Full risk scoring per zone, CVSS-OT findings prioritized by severity, remediation roadmap and executive summary. The core deliverable.

~35–45 pages · PDF · Auto-generated
100% 74% FR1 61% FR2 38% FR3 82% FR4 55% FR5 29% FR6 71% FR7 IEC 62443 — FUNCTIONAL REQUIREMENTS GAP ANALYSIS GAP CRITIQUE PARTIEL CONFORME TARGET FR1 FR3 FR5 FR7 GAP -41%
IEC 62443 Gap Analysis
IEC 62443 Gap Analysis

Detailed gap between current state and target Security Level (SL-1 to SL-4), control by control, for all 7 Functional Requirements.

~20–28 pages · PDF · Per FR domain
INTERNET / WAN NGFW IT ZONE SERVER ERP ACTIVE D DMZ HISTORIAN PROXY VPN OT ZONE — SL-2 SCADA HMI PLC/RTU FIELD DEVICES SENSORS ACTUATORS DRIVES NETWORK SEGMENTATION BLUEPRINT — IEC 62443-3-3 IT ZONE DMZ OT ZONE FIELD INTERNET FW IT ZONE DMZ OT ZONE FIELD IEC 62443
Network Architecture
Network Segmentation Blueprint

OT/IT zone and conduit mapping per IEC 62443-3-3, target architecture with segmentation recommendations and firewall rules guidance.

~15–20 pages · PDF + diagrams
ASSET ID TYPE ZONE FIRMWARE RISK SL PLC-001-A Siemens S7-300 Zone A v2.1.4 ⚠ C SL-2 HMI-003 Wonderware Zone A v8.2.1 H SL-1 SCADA-SVR-01 Ignition 8.1 DMZ v8.1.2 ⚠ C SL-2 RTU-007-B ABB RTU560 Zone B v4.0.3 L SL-1 FW-OT-DMZ-01 Fortinet FG-60F DMZ v7.2.1 H SL-2 VFD-012 Danfoss VLT Zone B v3.1.0 L SL-1 TOTAL: 47 assets · 7 CRITICAL · 15 HIGH · 25 LOW-MEDIUM 47 OT ASSET INVENTORY & CLASSIFICATION — IEC 62443-2-1 Generated by ARA · 14 June 2026 ASSET RISK SL PLC-001 SL2 HMI-003 SL1 SCADA SL2 RTU-007 SL1 47
Asset Management
Asset Inventory & Classification

Complete OT asset register with criticality classification, firmware versions, exposure level and IEC 62443 Security Level per device.

~10–15 pages · PDF + Excel export
Q1 PHASE 1 IT/OT Firewall MFA Remote IR Plan OT Q2 PHASE 2 Patch OT Asset Inventory PAM Vendors Q3 PHASE 3 IEC 62443 SL-2 NIS2 Docs SOC OT Setup Q4 NIS2 COMPLIANT NIS2 COMPLIANCE ROADMAP — 12 MONTH PLAN €120,000–185,000 total program · ARA platform: €2,990/year Q1 AUDIT GAP Q2 FIXES PRIO Q3 IMPL CTRL Q4 NIS2
Compliance Roadmap
NIS2 Compliance Roadmap

12–18 month remediation plan with phased milestones, effort estimates, budget projections and NIS2 compliance checkpoints per quarter.

~12–18 pages · PDF + project plan
EXECUTIVE SECURITY DASHBOARD Usine Nord SAS · June 2026 · CONFIDENTIAL SECURITY SCORE 59 / 100 SL-2: 59% · GAP: 41% 7 CRITICAL 12 HIGH 142 CONTROLS NIS2 STATUS Art.21b NON-CONF Art.21a PARTIEL Art.21g PARTIEL Art.21h PARTIEL TOP ACTIONS 1. IT/OT Firewall — 3w 2. MFA Remote — 2w 3. IR Plan OT — 4w PROGRAM COST €120k–185k total SECURITY SCORE 59 / 100 7 CRIT 12 HIGH 142 CTRL
Executive Reporting
Executive Security Dashboard

One-page COMEX summary: global security score, top 3 risks, investment priorities and ROI projection. Designed for board-level presentation.

1–2 pages · PDF · Board-ready

📄 Download Sample Report — Usine Nord SAS

Real ARA output · IEC 62443 SL-2 · 12 pages · PDF · See exactly what your assessment produces

⬇ Download Sample PDF

A real assessment. Completed in 3h 47min.

ARA Assessment Dashboard
Site: Usine Nord · IEC 62443 SL-2 · NIS2 Entité Importante
GAP IDENTIFIED Score: 59%
OVERALL SL-2
59%
Target: 100%
CRITICAL FINDINGS
7
Immediate action
HIGH FINDINGS
12
Within 30 days
CONTROLS ASSESSED
142
IEC 62443 SL-2
FUNCTIONAL REQUIREMENTS — IEC 62443
FR1
74%
FR2
61%
FR3
38%
FR4
82%
FR5
55%
FR6
29%
FR7
71%
TOP FINDINGS
CRITICALNo IT/OT network segmentationFR5.2
CRITICALRemote SCADA access without MFAFR1.4
CRITICALNo OT incident response planFR6.1
HIGHPLC firmware outdated (3 years)FR3.2
MEDIUMIncomplete asset inventoryFR2.1
Standards covered
IEC 62443-3-3IEC 62443-4-1IEC 62443-4-2 NIS2 DirectiveISO 27005NIST SP 800-82 NIST CSFNERC CIPMITRE ATT&CK ICS CVSS-OTISA99ANSSI

Transparent. No consulting surprises.

FREE
€0
1 assessment · no card required
  • 1 full IEC 62443 assessment
  • Basic risk dashboard
  • Summary PDF report
  • NIS2 overview
Get started free
PROFESSIONAL
€299 / month
or €2,990/year
  • Unlimited assessments
  • All 6 professional documents
  • Full PDF reports + remediation
  • MITRE ATT&CK ICS tagging
  • NGOT feed integration
  • API access
Start trial
ENTERPRISE
€399 / month
or custom pricing
  • Everything in Professional
  • White label option
  • SSO / Azure AD
  • Dedicated SLA
  • Custom standards
Contact us

Run your first OT risk assessment today.

No setup. No consultant required. Free first assessment.

✉ Request Demo